Estimates consist of labor hours for construction based on machining content, assembly, and fabrication.
- Assembly tooling
- Weld fixtures
- Checking fixtures
- Material handling equipment
- Storage equipment
- Transportation equipment
- Master Tool Planning List
This document enlists all the tooling requirements after the accessibility studies and cost estimation, that suffice the needs of the customer.
- Assembly tools
- Equipment
- Process equipment
- Develop and track cost
- Power tools
- Weld guns
- Facilities
No comments:
Post a Comment